The program aims to remove all asbestos buildings from Victorian schools and have them replaced with prefabricated buildings.
A far cry from the traditional temporary portable classrooms of the past, the new architecturally designed, modular classrooms are now popping up in schools around the state. The Government’s $200 million investment in the program has enabled schools to move with these more permanent alternatives.
To avoid any disruption to students, staff, or the school term, the characteristics of a modular build are very attractive in education projects. Advance planning and quicker construction times allow for buildings to be erected during school holidays whilst the students are off-site.
“The ability to complete the project within this timeframe is crucial. It is not only about minimising disruption to the classes, but also about avoiding safety risks to the students during construction”, explained Product Sales Manager, Simon Whalen.
The new research into improving modular buildings for use in schools is expected to pave the way for the future of prefabricated construction in public education in Australia. Research into structural design, thermal performance, and indoor environment quality was carried out before the programs commencement and is improving outcomes already.
Moe South Street Primary School was able to achieve thermal performance with the use of Kingspan’s AIR-CELL Insulbreak.
The thermo-reflective flexible insulation was installed around the walls of the building, in place of traditional non-reflective sarking.
“Being able to install the AIR-CELL off-site saves on labour costs and time at the point of construction; both of which are crucial factors in any education project and contributed greatly to the success of the Moe South Street Primary School project”, concluded Whalen.