1. Home
  2. Case Studies
  3. Kensington High Street

Case Studies

Kensington High Street

Every detail of the multi-million pound development has been carefully scrutinised to deliver the best possible experience for residents and this includes the specification of Kooltherm Pipe Insulation

Kensington High Street

Every detail of the multi-million pound development has been carefully scrutinised to deliver the best possible experience for residents and this includes the specification of Kooltherm Pipe Insulation

Discover The Potential

Scroll For More

The exclusive development from St Edward has been designed by Squire and Partners and was voted ‘Best London Home’ in the London Evening Standard New Homes Awards 2014. The seven blocks include a range of one to three bedroomed apartments along with a private swimming pool, gym, cinema and 24 hour Harrods concierge service.

Our Kooltherm Pipe Insulation System and Kooltherm Insulated Pipe Support Inserts, were installed on all constant hot water and low temperature hot water services associated with the main Energy Centre. Kooltherm Pipe Insulation offers industry leading performance with thermal conductivities as low as 0.025 W/m·K. This helped the Specialist M&E Contractor Briggs and Forrester (MEP) Ltd to minimise the space requirements for building services, maintaining the clean lines and luxury aesthetic of the apartments.

Steel framing manufacturers Sikla and Support Systems Ltd provided a high performance support solution for the pipework utilising Kooltherm Insulated Pipe Supports. Independent thermal analysis has shown that the insulated supports can reduce heat loss by up ten times compared with wooden block supports, helping to ensure compliance with the building regulations and delivering significant cost savings over time.

Photos are Copyright of 375 Kensington High Street, St Edward.

Kensington High Street
SECTORResidential
LOCATIONLondon
ProductsKooltherm Pipe Insulation, Kooltherm Insulated Pipe Support Inserts

"375 Kensington High Street is a great example of a solutions based package with several manufacturers coordinating from an early stage. It was the prior planning by the site team in my opinion that made the project a success. Once Briggs and Forrester had approved the initial proposals, Support Systems Ltd used our products and the Kingspan Kooltherm Insulated Pipe Support Inserts to fabricate the final pipework support solution at their facility. This streamlined the installation process saving both time and cost, whilst the high thermal efficiency of the Kooltherm Insulated Pipe Supports, combined with the structural performance of our products, should bring long-term benefits for the client."

Nigel Thompson, General Manager, Sikla

Start your project with us

Submit an Enquiry

Products Used in this Project

Find out more about our Products
Thin and efficient high performance pipe insulation
FEATURED

Kooltherm Pipe Insulation

Thin and efficient high performance pipe insulation

High performance insulated pipe support inserts
FEATURED

Kooltherm Insulated Pipe Support Inserts

High performance insulated pipe support inserts

BACK TO TOP
Contact us
Kingspan Insulation
Kingspan Technical Insulation
Kingspan Great Britain
Kingspan Insulation
Kingspan Technical Insulation
Legal information
Cookie Policy & Control
Terms & Conditions of Website Use
Website Privacy Notice
Modern Slavery Act Statement
Group Approach to Tax
Gender Pay Gap
Direct Marketing Consent Notice

© 2026 Kingspan Holdings (IRL) Limited, All Rights Reserved