Moe South Street Primary School

A Lesson in Modular Design

One of the first schools with modular walls to benefit from the Victorian Government’s Permanent Modular School Program which aims to remove all asbestos buildings from Victorian schools and replace them with prefab buildings.

Discover The Potential

Scroll For More

Moe South Street Primary
SECTOREducation
LOCATIONMoe, VIC
ProductsAIR-CELL Insulbreak

Moe South Street Primary School is one of the first schools to benefit from the Victorian Government’s Permanent Modular School Program.

The program aims to remove all asbestos buildings from Victorian schools and have them replaced with prefabricated buildings.

A far cry from the traditional temporary portable classrooms of the past, the new architecturally designed, modular classrooms are now popping up in schools around the state. The Government’s $200 million investment in the program has enabled schools to move with these more permanent alternatives.

To avoid any disruption to students, staff, or the school term, the characteristics of a modular build are very attractive in education projects. Advance planning and quicker construction times allow for buildings to be erected during school holidays whilst the students are off-site.

“The ability to complete the project within this timeframe is crucial. It is not only about minimising disruption to the classes, but also about avoiding safety risks to the students during construction”, explained Product Sales Manager, Simon Whalen.

It is estimated 100 schools will be erected as part of the program over the next four years, 30 of which have already been completed or are underway and 70 more to come before 2021.

Moe South Street Primary

The new research into improving modular buildings for use in schools is expected to pave the way for the future of prefabricated construction in public education in Australia. Research into structural design, thermal performance, and indoor environment quality was carried out before the programs commencement and is improving outcomes already. 

Moe South Street Primary School was able to achieve thermal performance with the use of Kingspan’s AIR-CELL Insulbreak.

The thermo-reflective flexible insulation was installed around the walls of the building, in place of traditional non-reflective sarking.

Moe South Street Primary

The use of AIR-CELL Insulbreak in this application was able to increase the overall thermal performance of the building. The product’s flexible nature also meant it was able to be installed offsite, working to the benefit of the modular design.

View AIR-CELL Insulbreak

The accessibility and ease of modular buildings has particularly benefited rural regions. These areas have previously found their limited access to labour forces meant conventional builds were inaccessible to them.

Moe South Street Primary

“Being able to install the AIR-CELL off-site saves on labour costs and time at the point of construction; both of which are crucial factors in any education project and contributed greatly to the success of the Moe South Street Primary School project”, concluded Whalen.

Discover More

Kingspan Optus Stadium Case Study 1

Optus Stadium

Perth's Famous Stadium

Case Study4 min read
Kingspan Continuous Insulation Knowledge Base Article 1

Spotted: Continuous Insulation

It is important to understand how continuous insulation can help

Knowledge Article4 min read
Kingspan Geelong Library & Heritage Case Study Centre Hero

Geelong Library & Heritage Centre

Geelong Library & Heritage Centre

Case Study3 min read
Kingspan Avoiding Condensation Knowledge Base Article 1

4 Tips on Avoiding Condensation

Condensation is a serious issue effecting buildings around the world

Knowledge Article3 min read
Kingspan Chau Chak Case Study Hero

UTS Sydney - Dr Chau Chak Wing Building

An enviable education building

Case Study6 min read
Kingspan Portsea Surf Life Saving Club Case Study Hero

Portsea Surf Lifesaving Club in Victoria

Portsea Surf Lifesaving Club in Victoria

Case Study4 min read
Kingspan Concrete Fire Safety Knowledge Base Article 1

Concrete Soffit Fire Safety

Why polystyrene insulation shouldn't be used In concrete soffits

Knowledge Article1 min read
Kingspan DHHS Case Study 1

Department of Health and Human Services (DHHS) High Rise

High-rise upgrade by the DHHS

Case Study4 min read
4859.1 Material R-value Declaration Procedure

AS/NZS 4859.1:2018 Material R-Value Declaration Procedure

Update to the Australian insulation standard 4859.1

Knowledge Article3 min read

Start your project

REQUEST A QUOTE

Featured Products

AIR-CELL Insulbreak
3-in-1 insulation, thermal break and vapour barrier

AIR-CELL Insulbreak

3-in-1 insulation, thermal break and vapour barrier

Stay updated
BACK TO TOP
Business Groups in Australia
Kingspan Insulation
Kingspan Insulated Panels
Kingspan Water & Energy
Products
Kooltherm Phenolic Insulation Boards
Therma PIR Insulation Boards
AIR-CELL Flexible Insulation Rolls
Contact Us
Get in Touch
LinkedIn
Instagram
Facebook
Legal Information
Cookies Policy & Control
Terms & Conditions of Website Use
Website Privacy Policy

© 2026 Kingspan Holdings (IRL) Limited, All Rights Reserved