1. Home
  2. Case Studies
  3. Pentre Awel

Case Studies

Pentre Awel

World-class centre for business, research, education, community healthcare and leisure encouraging people to lead active and healthy lives

Discover The Potential

Scroll For More

Carmarthenshire County Council appointed Bouygues UK to deliver Zone 1 of the Pentre Awel scheme which is expected to create over 1,800 jobs by 2032. This innovative, multi-million-pound development, one of nine projects being developed under the Swansea Bay City Deal, has been separated into four zoned phases with the first expected to be completed in autumn 2024. At the core of the first phase is a health and wellbeing hub which houses the leisure facilities, clinical delivery services and education and business development hubs.

One of the key design drivers on the project was reducing the embodied and operational energy, and minimising whole life impact. To meet this requirement, Bouygues UK implemented a range of measures during construction to reduce carbon emissions, waste, and energy. It also led to the specification of a highly insulated building envelope including the installation of Kingspan GreenGuard GG300 on ground floors across the core building.

arial image of Pentre Awel
side image of Pentre Awel
front image of Pentre Awel
SECTORHealth & pharmaceutical
LOCATIONCarmarthenshire, Wales
ProductsKingspan GreenGuard GG300

Located in south Llanelli, the prestigious development will bring together life science innovation and research, community healthcare, education and training all at one prime location.

Delivering a thermal conductivity of 0.033 W/mK and allowing the project team to meet the U-value target, Kingspan GreenGuard GG300 (XPS) boards also offer achieve a compressive stress of 300 kPa when tested to EN 826: 2013. This ensures they’re more than able to handle the significant daily foot traffic expected once the hub opens.

This excellent compressive performance means that the boards are suitable for a wide range of flooring applications including those exposed to loads from vehicles, such as car park decks and heavy-duty commercial, industrial, and cold store flooring applications.

The boards, produced at Kingspan Insulation’s Selby manufacturing facility in North Yorkshire, are manufactured under a management system certified to ISO 9001: 2015 (Quality Management Systems), ISO 14001: 2015 (Environmental Management Systems), ISO 45001: 2018 (Occupational Health and Safety Management), ISO 50001: 2018 (Energy Management Systems) and ISO 37301:2021 (Compliance Management Systems).

 

Page published: 15/09/25

Kingspan GreenGuard

XPS Floor Insulation
Learn more

Discover More

Node Cowork Entrance Case Study 16:9

Node Cowork

Discover how Kingspan insulation boards helped a new cowork space to achieve BREEAM ‘Excellent’

Case Study5 min read
Node Cowork Pond Case Study 16:9

How to Insulate Commercial Floors

Find out how to effectively insulate commercial floors

Knowledge Article5 min read
1000 Aztec West Case Study 16:9

1000 Aztec West

Learn how OPTIM-R E helped a refurbished office reach net zero operation.

Case Study4 min read
How To Insulate A Garage Floor Article 1:1

Guide for installing insulation in a basement extension

A guide for installing insulation in a basement extension

Knowledge Article5 min read

Start your project

Large/Commercial
Small/DIY Projects

Products used in this project

Find out more about the products used on this project below
Rigid extruded polystyrene (XPS) insulation

Kingspan GreenGuard GG300

Rigid extruded polystyrene (XPS) insulation

BACK TO TOP
Contact us
Kingspan Insulation
Kingspan Technical Insulation
Kingspan Great Britain
Kingspan Insulation
Kingspan Technical Insulation
Legal information
Cookie Policy & Control
Terms & Conditions of Website Use
Website Privacy Notice
Modern Slavery Act Statement
Group Approach to Tax
Gender Pay Gap
Direct Marketing Consent Notice

© 2026 Kingspan Holdings (IRL) Limited, All Rights Reserved