Delivered by M&S Character Homes, the renovation plans combine the former Royal Hotel’s main two storey building with the L-shaped additional building to create a single dwelling home. Built in the early nineteenth century, the property boasts striking period features such as oak beams and low ceilings.

South Street front of house
South Street garden view
South Street application image
SECTORResidential
LOCATIONKinross, UK
ArchitectScott Strachan
ProductsOPTIM-R Flooring System

Both the owners and architect’s dedication to retaining as many of these features as possible and the listed status of the building, meant there were some inherent design issues to be considered in order to comply with Scottish Building Standards.

"The OPTIM-R Flooring System was used as it met our thermal requirements at a third of the depth of a normal insulation board. Additionally, the head height in the other part of the hallway is very limited as there is an oak main beam. If Kingspan OPTIM-R hadn’t been used, the floor-to-ceiling height would have been 60 mm less." Murray Mitchell - Homeowner and Director of M&S Character Homes

Ceiling height in the ground floor hallway where a new staircase needed to be installed was particularly low. As the ceiling heights could not be raised, the OPTIM-R Flooring System was specified in a 30 mm thickness to meet the Building Standards for both the head height for the staircase and to achieve the required thermal performance.

The design of the OPTIM-R panels allows them to achieve optimum levels of insulation performance with a declared value thermal conductivity of 0.007 W/mK, therefore enabling the builders to achieve the modern regulations. Whilst their nominal thickness makes them ideal for projects where the floor to ceiling height is more limited, as they can reduce the amount of digging down required to maintain the existing floor level after the insulation is fitted.

"As the property is Grade B listed, there are certain limitations to how far it can be altered. The much-altered historical building fabric, current dilapidated state of repair & new owners’ enthusiasm for the property provided a unique opportunity at this stage to both conserve the existing historic building fabric and create a new 21st century chapter in the history of the building".

Scott Strachan - Architect

Page updated 18/03/2026

Discover More

Royal Pavillion Corner Case Study- 4:3

Royal Pavilion

Apartment building benefits from the exceptional thermal performance of OPTIM-R floor insulation

Case Study4 min read
How To Insulate A Garage Floor Article 4:3

How to Insulate a Garage Floor

Thin floor insulation can make a big difference when converting a garage

Knowledge Article5 min read
London Bridge Station Street Case Study- 4:3

London Bridge Station

London’s oldest station receives a significant upgrade to meet its increasing demands

Case Study6 min read
Can You Fix Insulated Plasterboard To Existing Plastered Walls Article 16:9

What is an Exposed Perimeter?

The exposed perimeter is the total length of all exposed walls surrounding the floor to insulate

Knowledge Article3 min read

Start your Project

Large/Commercial
Small/DIY Projects

Products Used in this Project

Find out more about the products used on this project below
Optimum performance solution

OPTIM-R Flooring System

Optimum performance solution

BACK TO TOP
Contact us
Kingspan Insulation
Kingspan Technical Insulation
Kingspan Great Britain
Kingspan Insulation
Kingspan Technical Insulation
Legal information
Cookie Policy & Control
Terms & Conditions of Website Use
Website Privacy Notice
Modern Slavery Act Statement
Group Approach to Tax
Gender Pay Gap
Direct Marketing Consent Notice

© 2026 Kingspan Holdings (IRL) Limited, All Rights Reserved